Technical information
Technical information
Technical documents*
(*) All the content in the technical documents is in Portuguese.
Forecast of box center times (GMT)
Solar interference at earth stations
During the March and September equinoxes, the alignment between the Sun and the satellites can cause interference at antennas. Check below for tools to estimate solar impact during these periods.
Effects of solar activity on satellites
Check our detailed guide on:
ANATEL Resolution - Compliance Report
On January 30, 2019, Anatel Resolution 700 made the issuance of Compliance Reports (RCE) mandatory for earth transmission stations. The document establishes safe limits for exposure to radiation emitted by radiocommunication systems, including cellular networks, point-to-point links, and satellites.
Every transmitting station with a power equal to or greater than 2W must have a Compliance Report with the parameters established by Anatel. In the case of new stations, the Compliance Report is a prerequisite for the responsible party to issue the declaration that will be used in their licensing.
Every transmitting station with a power equal to or greater than 2W must have a Compliance Report with the parameters established by Anatel. In the case of new stations, the Compliance Report is a prerequisite for the responsible party to issue the declaration that will be used in their licensing.
Report 700
To assist our clients in complying with Anatel's requirements, we offer the Report 700 service, which performs a theoretical analysis of stations based on parameters such as location, antenna dimensions, power, and transmission angle. After the evaluation, we issue the corresponding Compliance Report.
To request this service, please contact us .
To request this service, please contact us .
